|
| |
Environmental
Parameters
Required Temperature: 64-86 degrees
Minimum Floor Temperature: 59 degrees
Humidity: 35-70%
Concrete should be cured for 60 days to a vapor flow rate
of 3lbs per 24-hours per 1,000 sq. ft.
Paint should be cured for 3 days before installation.
Radiant heat should be on at 80 degrees for three days before
installation. |
|